Fault causing the undesired power outages are summarised as follows
· Fault in Extra High Voltages Power lines
· Fault in grid station equipment
· 11KV feeders fault / High Tension cable faults
· Fault in 11KV overhead feeder / inter linking High Tension Over Head
· High tension fuse link / jumpers
· Theft of conductor
· Pick axed / damages to underground cables by civic agencies
Fault in 11KV distribution
· Damage to 11KV switch
· Fault in 11KV distribution transformer
· High tension / low tension leads of local transformer damaged / stolen
· Low tension panel damage / stolen
· Low tension panel lead burnt out
· Low tension panel fuse blown off
· Fault in low tension cable from panel to overhead circuit
· Damage to high tension pole
Low tension 380/220 A/C network
· Low tension wire broken
· Low tension jumper burnt out
· Theft of low tension copper wire main conductor
· Low tension pole damage
Low tension mains to consumers
· Service wire broken
· Service cable fault
· Damage to energy meter
Remedial Actions
Short Term
· The specific faulty portion is repaired / replaced in the light of nature & gravity of fault.
· If the damages are beyond repair, the faulty portion is isolated & rest is normalised. The effected consumers are fed through alternate supply arrangement till original status is restored.
Long term - high tension / low tension network
Certain projects have already been planned and are under execution to;
· Encounter system short fall
· To meet the load growth
· Relieving of overloading if high tension / low tension network
· Considerable reduction in time to isolate the fault / equipment
· Capacity enhancement in distribution network with taking out new 11KV U/G feeders, installations of PMT's
Improvements of high tension / low tension voltage profile with the installation of high tension / low tension capacitors.