Our plan

OUR PLAN

KESC generation projects:

 

Name of Power  Plant

Location

Plant Type

Capacity (MW)

*Commissioning Date

Advantage

SGTPS-2

SITE Area

Engine Plant

88

Jun to Aug, 09

Higher thermal efficiency, fast track, low cost project

KGTPS-2

Korangi Industrial Area.

Engine Plant

88

Aug to Dec 09

Higher thermal efficiency, fast track, low cost project 

Korangi CCPP

Korangi

Combined Cycle Four LM6000 GE Gas Turbines and steam turbine

  220

Nov 08 to Sep 09

Higher thermal efficiency, Additional fleet capacity.

560 MW BQPS2 Port Qasim Industrial Area Combined Cycle Three GE Frame 9E Gas Turbines and steam turbine 560 **April’ 12 Higher thermal efficiency, Additional fleet capacity.

 * ( Commissioning carried out in phases to expedite power addition to the system)

 ** ( COD expected in May 2012)