Name of Power Plant |
Location |
Plant Type |
Capacity (MW) |
*Commissioning Date |
Advantage |
|
SGTPS-2 |
SITE Area |
Engine Plant |
88 |
Jun to Aug, 09 |
Higher thermal efficiency, fast track, low cost project |
|
KGTPS-2 |
Korangi Industrial Area. |
Engine Plant |
88 |
Aug to Dec 09 |
Higher thermal efficiency, fast track, low cost project |
|
Korangi CCPP |
Korangi |
Combined Cycle Four LM6000 GE Gas Turbines and steam turbine |
220 |
Nov 08 to Sep 09 |
Higher thermal efficiency, Additional fleet capacity. |
| 560 MW BQPS2 | Port Qasim Industrial Area | Combined Cycle Three GE Frame 9E Gas Turbines and steam turbine | 560 | **April’ 12 | Higher thermal efficiency, Additional fleet capacity. |
* ( Commissioning carried out in phases to expedite power addition to the system)
** ( COD expected in May 2012)